The board of trustees approved the construction of a new building for the theology library on the Searcy campus. When this $8.5 million project is complete, Harding School of Theology’s vast collection will be housed in 18,000 square feet of space.
Read more on HUtoday.
Designation ID: C000001743
New University Bus
Help Bisons travel safely and impact students for years to come.
Hundreds of students travel on Harding buses each year with athletic teams, music ensembles and academic groups. After charting nearly 900,000 miles, the 1999 Prevost is retiring due to costly maintenance, and Bisons will enjoy the comvort and safety of a new 2025 Freightliner Ultra Coach. With seats for 51, this bus features a restroom, TBs and WiFi for an enhanced travel experience.
- 65,000 + miles annually
- 800+ passengers
- Dedicated drivers
- Harding Academy groups
- Summer trips include Upward Bound and Honors Symposium
Designation ID: C000895107
Holland-Waller Center
The nearly 26,000 square foot Holland-Waller Center includes state-of-the-art classrooms, several conference rooms, a large student common area, a covered outdoor terrace, and numerous offices and administrative spaces round out this modern campus hub.
The Holland-Waller Center opened in Fall 2023 and hosts the Clifton L. Ganus Sr. Department of History and Political Science, the department of foreign languages and international studies, the ROTC program and the Swaid Institute for International Education, which includes Harding’s international study abroad programs, international student services, the China and East Asia program and the Walton International Scholarship Program.
It is located on our historic front lawn in the place of the former Ganus Building and is a gateway to Legacy Park.
Designation ID: C000001737
Track and Football Field Renovation
The football field received new turf and was moved closer to the home stadium, creating a better home-field advantage for football games. The visitor stands also moved closer to the field.
After the 2023 football season, this project was completed with a new concession stand, restrooms and sidewalks and walls to enclose the stadium. A new weight room and training room replaced the existing one that serves approximately nine other collegiate athletic teams. This project impacts students and athletes as well as spectators and community programs.
Designation ID: C000001738